established and trading as access providers since 1987!

our company |   safety at work !   about us!      hire+sales!

 We will reply to enquiries. Send us your needs and we will reply to you as quickly as possible, with details of our recommendations and a approximate price.  Welcome to our web-site we hope that you find our service is what your looking for! we give a warm and friendly hello to all. The next stage will be a site visit to see if there are any known difficulties or restrictions when the erection takes place. Such as overhead power cables that are required to be shrouded for safety, as the safety aspect is our priority at all times. Once the site visit is completed a estimate will be given to the client. At this stage we would like any additional requirements pointed out to us, as we supply all the equipment required for the specified contract. If extra is needed for other work we will supply it with the job but we need to know about it in advance. Our price is for completing each stage of the scaffolding once it does'nt include looking for equipment if some of it is removed. For work elsewhere on the site a worker as to locate it and return it so that the platform you are about to work on is complete. This is required as a safety measure and for our insurance requirements to be kept all in order and valid. If you require extra boards, fittings, and tube it is only a phone call away from you we carry just the required equipment as a rule. But we also have large stocks available if you need extra, we advise you not to use the equipment off the main erection. This is for your own safety reasons if the structure is altered without authorization by us. It is classed as incomplete and our insurance of it is no longer valid for people to work on it. So if a accident happens because handrails, toeboards, or ties and braces. Have been removed for use on work elsewhere on the site our insurance
Please be aware of this before you remove anything from our scaffolding to use elsewhere. It may render the erection incomplete and unusable any alterations. Should be authorized by GMK Scaff-form only! 
  
GMK Scaff-form scaffolding contractors       scaffolding                                                                    Temporary roof
                                                                     

Temporary roof                                             scaffolding                


 scaffolding


This web-site does not show and will never show erections other than our own everything that is shown is our work. To put on here and reference others work as ours would be both misleading and wrong to do. As most of our work is not a permanent part of the building. When the work is completed all of our equipment will be removed leaving no evidence it was ever ours that was there. But our records will show the date and location of every job shown on this or any other page of the web-site ask by the reply form if you doubt any detail on this WebSite relevant details will be sent to you. As the WebSite was made by GMK Scafform for it's customers use all the details are easily found. Please only ask for detail's using Email this will not be available by phone as the records and ID's will not be stored the same way      

  Our priority is and will remain a safe and reliable scaffolding service to all 

scaffolding   support scaffolding  summer scaffolding  scaffolding

We hope that just from this brief look at some of our work, you will see it covers a vast array of types of work that we have completed. There is'nt a uniform type of work that we take on but prefer to have a varied schedule of contracts to focus on all the time. There was a period not very long ago when most of our contracts where housing developments, mostly go to the site and add a level to the existing scaffolding. Which does become a very tedious routine if you perform it a multitude of weeks at a specific time. With the housing market now subsided we still receive quite a good number of new house contracts. But now these are mostly a single or pair of houses not a large number in one location so are not keeping you in one place for weeks. But this is often how life is, you never get everything you'd like in it we all wish you did. The cold time of year people wishing they did scaffolding for
a living is few and far between. But most who work in the industry are accustomed to the cold and wet climate of the UK and it's another day at work to them. Unlike the summer scene's on some photo's when everybody wants your job outside in the sun, the weather very rarely stops your job proceeding in our schedule. Extremely bad rain will leave the workers soaked and cold but they mostly carry on as much as is possible unless it involves chimneys and getting onto a slate roof where it is just to dangerous to continue. In these cases the job will be delayed until the rain stops and the roof is dry enough to continue. When the rain stops a time for the surface to dry out is also required in January far longer than is needed in August. The time of year as many attributes that govern how work can proceed, wheather conditions, hours of daylight, any number of things not listed. Our work schedule at times as a lot to do with the time needed before we can get there. We have always tried to run a impartial job's list of customers. When a job is booked it is assigned a ID and time we try to keep. To this as much as we can but for things beyond our control.




                                                                  


                  GMK Scaff-form scaffolding contractors